Showing posts with label TCN. Show all posts
Showing posts with label TCN. Show all posts

Wednesday, 8 January 2014

GEJ Issues Six- Months Ultimatum On Stable Power

 
President Goodluck Jonathan has issued an explicit ultimatum to managers of Nigeria’s electricity sector, especially the Ministry of Power to as a matter of urgency ensure that the electricity generated is effectively transmitted and distributed across Nigeria within the next six months.
Currently, Nigeria has a total installed generation capacity of 6,976.40 megawatts (MW) with expectations of upward expansion from the National Integrated Power Projects (NIPPs).
However, the country often transmits less than 4,000MW, leaving most consumers in towns and cities nationwide in darkness for long hours.

RELATED POSTS

Related Posts Plugin for WordPress, Blogger...

Followers